Tuesday, March 8, 2011

10 Hp King Snow Blower

STS-133 Flight Day 14

down at KSC Orbit 202

day now - dd.hh.mm. ss - Operation
09Mer 0823 - 12.10.30.00 - Awakening
09Mer 1058 - 12.13.05.00 - Start Computer Group B
09Mer 1113 - 12.13.20.00 - Initial alignment IMU
09Mer 1138 - 12.13.45.00 - Withdrawal PGSC (Part 2)

1152:00 - Start sequence return

1207:00 - Closing radiators
1217:00 - Installing seats astronauts
1223:00 - Preparation for return Computer
1227:00 - Configuration hydraulic
1252:00 - Check evaporator cooling
1258:00 - Disable load
1312:00 - Closing the doors of the hold
1322:00 - GO of Mission Control for OPS-3
1332:00 - OPS-3 transition
1357:00 - Checking switches for the return
1407:00 - Update PAD to return
1412:00 - Review procedures
1427: 00 - CDR / PLT wearing overalls
1444:00 - IMU alignment
1452:00 - CDR / PLT to places; MS wearing overalls
1509:00 - Shuttle steering control commands
1512:00 - Preboot hydraulic
1519:00 - Turning off toilet

1532:00 - MCC GO for ignition deorbiting
1538:00 - MS in places
1547:00 - Single APU start

1552:04 – Accensione deorbitante
- Deorbit dT: 02 min 36 sec
- Deorbit dV: 310 km/h
1554:40 – Accensione completata

1625:57 – Interfaccia di rientro
1630:48 – Primo comando di sterzata a destra
1638:04 - Primo comando di sterzata a sinistra
1644:00 – Acquisizione radar C-band
1651:11 - speed below mach 2.5
1653:23 - speed below mach 1
1654:13 - steer right to the Runway 15
1657:44 - Landing

The route of approach to Kennedy Space Center [NASA].

Hours UTC - the Italian one is +1.

The acronyms can be found here described.

0 comments:

Post a Comment